The Annual Offshore Engineering Technology & Equipment Event
logo

The 15th Beijing International Offshore Engineering Technology & Equipment Exhibition

ufi

BEIJING,CHINA

March 26-28,2025

LOCATION :Home> Media & Partner > Exhibition News

The three Marine ranching platforms are jointly launched

Pubdate:2018-03-10 10:31 Source:weixudong12300 Click:

At 8:00 a.m. on March 6, the joint launching operation of the three self-elevating Marine ranching platforms in the central part of the company began at longkou base. After longkou base project, production, logistics and water ministry departments and so on eight hours of work together, the three sea ranch platform in two tug and three auxiliary cooperate with the fishing boats, smoothly on teri, floating homework, at present, the platform has landing mooring, parked at the specified position. At this point, the launch of the first project of longkou base in 2018 will be completed successfully. The three platforms will also be able to sail to the designated area of the shipowner in the near future, and complete the post delivery.

Since the construction of the Marine ranching platform from longkou base in 2016, it has never been stopped to reduce the launching cost. With the joint efforts of the ministry of water, technology and base, two Marine ranching platforms were successfully launched in May 2017. In this case, the launching of the water, the three platforms at the same time, the cost of launching a single project decreased by more than 30%. This is the continuous optimization of the launching process of the Marine ranching platform, which reflects the continuous improvement of cost management and the result of the improvement of the company's "three jobs" in 2018.

Later, the base will summarize the experience and apply the optimized launching process to the launching of the Marine ranching project.